The Fiscal–Procurement–Quality Nexus In Public Construction: A Systematic Review Of Construction Capital Expenditure, Bid Prices, And Project Quality
DOI:
https://doi.org/10.55681/economina.v5i8.3517Keywords:
Systematic Literature Review, PRISMA, Construction Capital Expenditure, Bid Price, Construction Quality, Public Procurement, Public Construction ProjectsAbstract
Construction capital expenditure is a strategic fiscal instrument for delivering public infrastructure, but its contribution to construction quality is not determined solely by the size of the allocated budget. In public construction projects, fiscal allocation is converted into project outcomes through cost estimation, procurement mechanisms, contractor bidding behaviour, bid price reasonableness, contractor capability, risk management, contract functions, and quality control. This study systematically reviews the relationship between construction capital expenditure, bid price, and construction quality in public construction projects. A PRISMA-based Systematic Literature Review was conducted by synthesizing 57 selected scholarly sources consisting of 39 core synthesis sources, 11 included-with-caution sources, and 7 supporting references. The novelty of this study lies in the development of a fiscal–procurement–quality framework that positions bid price as a conceptual mediating mechanism between construction capital expenditure and construction quality. By integrating Public Fiscal Theory, the Cost-Based Pricing Perspective, and the Resource-Based View, this review explains how public fiscal allocation is translated into contractor implementation capacity and construction quality through procurement mechanisms. The findings identify five dominant themes: construction capital expenditure and budget governance, bid price formation and public procurement, contractor capability and performance, construction quality and quality risk, and digital cost–quality governance. Practically, the study emphasizes value-based procurement, rational bid price evaluation, contractor capability assessment, risk-based project control, contract-function governance, and digital transparency to improve construction quality in public construction projects.
Downloads
References
Abdelalim, A. M., Salem, M., Salem, M., Al-Adwani, M., & Tantawy, M. (2025). Analyzing Cost Overrun Risks in Construction Projects: A Multi-Stakeholder Perspective Using Fuzzy Group Decision-Making and K-Means Clustering. Buildings, 15(3). https://doi.org/10.3390/buildings15030447
Adianto, Y. L. D., Wimala, M., & Harun, A. M. (2022). Faktor-faktor Pengaruh Besaran Estimasi Biaya Tidak langsung Pada Penawaran Pekerjaan Jalan Oleh Kontraktor X. Jurnal Rekayasa Sipil (JRS-Unand), 18(1), 52. https://doi.org/10.25077/jrs.18.1.52-59.2022
Agusjaya, S. A., Carlo, N., & Zulherman, Z. (2023). Analisis Pengaruh Faktor Modal Kerja terhadap Kinerja Proyek Konstruksi Gedung di Kota Jambi. Jurnal Ilmiah Universitas Batanghari Jambi, 23(3), 2842. https://doi.org/10.33087/jiubj.v23i3.4400
Alba-Rodríguez, M. D., Lucas-Ruiz, V., & Marrero, M. (2025). Systematic Methodology for Estimating the Social Dimension of Construction Projects—Assessing Health and Safety Risks Based on Project Budget Analysis. Buildings, 15(13). https://doi.org/10.3390/buildings15132313
Aldossari, K. M. (2025). Cost and Schedule Performance in Higher Education Construction Projects in Saudi Arabia. Advances in Civil Engineering, 2025(1). https://doi.org/10.1155/adce/7448384
Alfalah, G., Aldajani, S., Elshaboury, N., Al-Sakkaf, A., & Alshamrani, O. (2024). Development of a Performance Assessment Model for Contractors in Saudi Arabian Construction Projects. Advances in Civil Engineering, 2024. https://doi.org/10.1155/2024/8780539
Alif, R., Hazmi, A., Keuangan, P., & Stan, N. (2024). OPTIMALISASI KERJA SAMA PEMERINTAH DENGAN BADAN USAHA UNTUK MENDORONG PEMBANGUNAN INFRASTRUKTUR DI INDONESIA. In Journal of Law, Administration, and Social Science (Vol. 4, Number 6).
Alkilani, S., & Loosemore, M. (2024). An investigation of how stakeholders influence construction project performance: a small and medium sized contractor’s perspective in the Jordanian construction industry. Engineering, Construction and Architectural Management, 31(3), 1272–1297. https://doi.org/10.1108/ECAM-06-2022-0539
Arifin, Z., & Arviansyah, A. (2024). Analisis Risiko the Lowest Bid Method dalam Public Procurement di Kementerian Keuangan. Jurnal Akuntansi, Keuangan, Dan Manajemen, 6(1), 179–195. https://doi.org/10.35912/jakman.v6i1.3616
Artopo, A., Darjanto, & Dwidjaja Adi, T. (2025). Factors Influencing the Budget Performance of Ministries and Agencies. In Jurnal Anggaran dan Keuangan Negara Indonesia (Vol. 7, Number 2). https://jurnalbppk.kemenkeu.go.id/akurasi
Bachtiar, R., Pramanda, H., & Mahmud, I. (2022). Pengaruh Kualifikasi Kontraktor Terhadap Kualitas Proyek Menurut Permen PUPR No.7 Tahun 2019 di Kota Banda Aceh (Vol. 1). https://www.google.co.id/maps
Bai, X., & Zhao, H. (2018). Reliability Evaluation In Construction Quality Based On Complex Vague Soft Expert Set Method. Stavební Obzor - Civil Engineering Journal, 27(3). https://doi.org/10.14311/cej.2018.03.0033
Barney, J. (1991). Firm resources and sustained competitive advantage.
Daxiao, X. U., Dongming, X. U., & Pengfei, L. I. (2020). Correlation Analysis between the Control Degree of the Construction Project Department to the Labor Subcontracting Team and the Construction Quality. IOP Conference Series: Materials Science and Engineering, 780(5). https://doi.org/10.1088/1757-899X/780/5/052002
Dewata, E., Wahyuni, S., Jauhari, H., & Oktarida, A. (2022). Performance-Based Budgeting, Preventive Supervision, and Effectiveness of Budget Control. Sriwijaya International Journal Of Dynamic Economics And Business, 357–372. https://doi.org/10.29259/sijdeb.v5i4.357-372
Dewi, K. P., & Susetyo, B. (2022). Analisis Pengaruh Penawaran Harga Kontraktor Terhadap Hasil Kewajaran Harga Metode SEM-PLS Pada Tender Konstruksi Proyek Pemerintah.
Farhanah, S., & Susilawati, S. (2022). Pengaruh Mekanisme Corporate Governance Dan Value Added Human Capital Terhadap Kinerja Keuangan. In JURNAL AKUNTANSI (Vol. 11, Number 2). http://ejournal.stiemj.ac.id/index.php/akuntansi
Farshadnia, S. M., Arghami, S., Shahab Safa, A., & Majidi, F. (2018). A Budgeting Model for the Safety Unit of an Under Construction Metro Station in Tehran Using a Robust Optimization. Journal of Human, Environment, and Health Promotion, 4(3), 131–137. https://doi.org/10.29252/jhehp.4.3.7
Firmansyah, A. (2025). Improving The Effectiveness Of Public Financial Supervision: The Role Of Apip And Challenges In The Modern Era. In Jurnal Anggaran dan Keuangan Negara Indonesia (Vol. 7, Number 2). https://jurnalbppk.kemenkeu.go.id/akurasi
Gede, I., Prasetya, Y., Putu, I. A., Mahapatni, S., Kunci, K., Hps, :, Penawaran, H., & Pelaksanaan, W. (2023). Analisis Rasio Penurunan Harga Penawaran Kontraktor Dengan Harga Perkiraan Sendiri (HPS) Serta Hubungannya Terhadap Waktu Pelaksanaan Proyek Gedung (Studi Kasus: Proyek Pemerintah Di Kota Denpasar). Jurnal Ilmiah Kurva Teknik, 12(1). https://e-journal.unmas.ac.id/index.php/jikt
Gharaibeh, L., Matarneh, S., Lantz, B., & Eriksson, K. (2024). Quantifying the influence of BIM adoption: An in-depth methodology and practical case studies in construction. Results in Engineering, 23. https://doi.org/10.1016/j.rineng.2024.102555
Gunasekara, K., Perera, S., Hardie, M., & Jin, X. (2021). A contractor-centric construction performance model using non-price measures. Buildings, 11(8). https://doi.org/10.3390/buildings11080375
Haiyirete, X., Liu, X., Wang, J., & Xu, Q. (2025). Exploring the propagation mechanism of construction quality risks in major projects from the perspective of complex networks. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ECAM-07-2024-0969
Hans, S., & Anastasia, N. (2024). Pengaruh Manajemen Modal Kerja Terhadap Profitabilitas Perusahaan Jasa Konstruksi Publik Di Indonesia Periode 2018-2022. Dimensi Utama Teknik Sipil, 11(1), 45–56. https://doi.org/10.9744/duts.11.1.45-56
Hidayat, S. F. (2024). Pengaruh Contract Change Order (CCO) Terhadap Kinerja Biaya, Mutu Dan Waktu Pada Proyek Bangunan Gedung. Jurnal Ilmiah Nusantara ( JINU), 1(6), 485–491. https://doi.org/10.61722/jinu.v1i6.2910
Iyer, S., Krishna, M., & Arora, S. V. (2023). Bidding under uncertainty: Harsh Constructions. Emerald Emerging Markets Case Studies, 13(1), 1–20. https://doi.org/10.1108/EEMCS-08-2022-0270
James, A., Rotimi, F. E., & Purushothaman, M. B. (2025). Evaluating risk management strategies in residential construction: their influence on project performance in NZ. Smart and Sustainable Built Environment. https://doi.org/10.1108/SASBE-04-2025-0194
Jasim, N. A. (2021). Evaluation of Contractors Performance in Iraqi Construction Projects Using Multiple Criteria Complex Proportional Assessment Method (COPRAS). IOP Conference Series: Materials Science and Engineering, 1076(1), 012106. https://doi.org/10.1088/1757-899x/1076/1/012106
Jiang, C., Li, X., Lin, J. R., Liu, M., & Ma, Z. (2023). Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning. Automation in Construction, 150. https://doi.org/10.1016/j.autcon.2023.104817
Jiang, S., Zhang, J., & Mao, Y. (2024). Construction quality problems prevention based on coupling relationship mining. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ECAM-03-2024-0328
Johantri, B., Keuangan, P., Stan, N., & Aprilia, R. (2021). Penawaran Harga Pekerjaan Konstruksi Pemerintah Di Era Pandemi (Studi Empiris Pada Kementerian Keuangan).
Kasdy, L. M., Nadirsyah, N., & Fahlevi, H. (2019). Pengaruh pendapatan asli daerah, dana perimbangan, dan sisa lebih perhitungan anggaran terhadap belanja modal dan implikasinya pada realisasi belanja modal pada pemerintahan kabupaten/kota di Indonesia. Jurnal Perspektif Ekonomi Darussalam, 4(1), 1-18.
Li, J., & Li, Y. (2022). Construction Cost Budget Control Based on the Dynamic Distributed Clustering Algorithm. Advances in Multimedia, 2022. https://doi.org/10.1155/2022/2970872
Liu, D., Wang, H. W., Li, H., Wang, J., & Khallaf, M. (2019). Hierarchical task network approach for time and budget constrained construction project planning. Technological and Economic Development of Economy, 25(3), 472–495. https://doi.org/10.3846/tede.2019.9384
Ly, A. (2023). Hubungan Faktor Yang Mempengaruhi Harga Penawaran Rendah, Kinerja Biaya Dan Kepuasan Pengguna Jasa Konstruksi Di Kota Kupang. http://e-journal.uajy.ac.id/id/eprint/29846
Mahadik, S., & Topkar, V. (2023). Validity and reliability testing of the questionnaire used to finalize criteria for the evaluation of the contractor’s performance. Archives of Civil Engineering, 69(4), 477–492. https://doi.org/10.24425/ace.2023.147671
Maqfirah, A., Oktaviani, C. Z., Fachrurrazi, Mubarak, & Bulba, A. T. (2025). Factors influencing contractor’s decisions in determining bid prices. IOP Conference Series: Earth and Environmental Science, 1510(1). https://doi.org/10.1088/1755-1315/1510/1/012068
Marlina, L. (2019). Pengaruh Kinerja Keuangan Daerah Dan Budget Ratcheting Terhadap Alokasi Belanja Modal (Bukti Empiris Pada Kabupaten/Kota di Provinsi Aceh).
Matto, M. (2025). Contractor selection process and performance of construction projects: exploring the mediating role of technical and financial examination of tenders. Engineering, Construction and Architectural Management, 1–18. https://doi.org/10.1108/ECAM-08-2024-1063
Musgrave, R. A., & Musgrave, P. B. (1989). Public finance in theory and practice (5th ed.). McGraw-Hill.
Nurhakim, E. S., Soma, A. M., & Yunita, I. (2024). Constructing Optimal Portfolios Using the Single Index Model and Markowitz Model: A Study on Cryptocurrencies. Journal of Accounting and Strategic Finance, 7(2), 200–218. https://doi.org/10.33005/jasf.v7i2.485
Oo, B. L., Nguyen, A. T., Ahn, Y., & Lim, B. T. H. (2025). Predicting the number of bidders in construction competitive bidding using explainable machine learning models. Construction Innovation, 25(7), 158–188. https://doi.org/10.1108/CI-10-2024-0325
Oppusunggu, L. S., Wati, L. N., Ispriyahadi, H., Tinggi, S., Ekonomi, I., & Jakarta, M. (2023). Journal of Economics, Finance and Management Studies The COVID-19 Pandemic’s Impact on Financial Performance and Market Performance in Nine Indonesian Business Sectors. https://doi.org/10.47191/jefms/v6-i1-43
Oyeyipo, O. O., Odusami, K. T., Ojelabi, R. A., & Afolabi, A. O. (2016). Factors affecting contractors’ bidding decisions for construction projects in Nigeria. Journal of Construction in Developing Countries, 21(2), 21–35. https://doi.org/10.21315/jcdc2016.21.2.2
Rahmat, A. F., Rahmanto, F., Firmansyah, M. I., Mutiarin, D., Program, P., Magister, I., & Pemerintahan, J. (2020). Spending Review Berbasis Performance-Based Budgeting (PBB) Terhadap APBD Kabupaten Sleman Tahun 2017-2018. https://doi.org/10.33366/rfr.v%vi%i.1676
Sabri, I. S., Ali, M. N. B., Aziz, R. A., & Ismail, I. M. E. H. B. (2021). Towards Better Contractor Performance to Achieve Sustainable Road Project Development. IOP Conference Series: Earth and Environmental Science, 641(1). https://doi.org/10.1088/1755-1315/641/1/012017
Sadick, A. M., Gurmu, A., & Gunarathna, C. (2025). Artificial intelligence-based pre-conception stage construction budget decision-making model and tool for residential buildings. Engineering, Construction and Architectural Management, 32(7), 4552–4580. https://doi.org/10.1108/ECAM-11-2023-1108
Santoso, I. S., Suroso, A., & Amin, M. (2023). Pengaruh Tingkat Penerapan BIM 5D Terhadap Kinerja Biaya Proyek Konstruksi. Konstruksia, 14(2), 83. https://doi.org/10.24853/jk.14.2.83-92
Shan, J., Chai, C. S., Lim, B. C. Y., & Palaneeswaran, E. (2024). Unveiling the digital horizon: Bridging the realms of digital twinning and construction project management performance. Journal of Infrastructure, Policy and Development, 8(9). https://doi.org/10.24294/jipd.v8i9.6509
Subrata, A., Halimah, M., & Alexandri, M. B. (2020). The Effect Of Under 80 % Bidding Policy Implementation On The Quality Of Construction Work In Bandung Regency (Vol. 3, Number 3).
Syaferi, D. O., Hidayat, B., Ophiyandi, T., & Ferial, R. (2021). Analysis of the contractor’s performance during the COVID-19 pandemic in West Sumatra Province. IOP Conference Series: Earth and Environmental Science, 708(1). https://doi.org/10.1088/1755-1315/708/1/012064
Widyaningsih, W., Masitoh W, E., & Siddi, P. (2020). Analisis strategi manajemen PT. Derma Kusuma Artha dalam mengembangkan usaha. Jurnal Akuntansi, Keuangan, Dan Manajemen, 1(4), 239–253. https://doi.org/10.35912/jakman.v1i4.39
Xu, Z., Huang, T., Li, B., Li, H., & Li, Q. (2018). Developing an IFC-Based Database for Construction Quality Evaluation. Advances in Civil Engineering, 2018. https://doi.org/10.1155/2018/3946051
Yang, J., Li, Z., & Yang, G. (2024). Research on construction project cost budget and cost control based on matrix model. Applied Mathematics and Nonlinear Sciences, 9(1). https://doi.org/10.2478/amns.2023.2.00759
Yang, K., Kim, K., & Go, S. (2021). Towards effective safety cost budgeting for apartment construction: A case study of occupational safety and health expenses in South Korea. Sustainability (Switzerland), 13(3), 1–13. https://doi.org/10.3390/su13031335
Yang, M., Chen, H., Xu, Y., & Wu, J. (2025). The Impact of Contract Functions on Contractors’ Performance Behaviors: A Mixed-Methods Approach. Buildings, 15(19), 3438. https://doi.org/10.3390/buildings15193438
Zhang, K., & Tsai, J. S. (2021). Identification of critical factors influencing prefabricated construction quality and their mutual relationship. Sustainability (Switzerland), 13(19). https://doi.org/10.3390/su131911081
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 JURNAL ECONOMINA

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.