[1]
Rudddin, R., Tangngisalu2, J. and Alam, S. 2026. The Effect of Work Time and Cost Control on Project Cash Flow Through Achieving Profit Target in The Construction of The Jenelata Dam Pt. Adhi Karya (Persero) TBK. JURNAL ECONOMINA. 5, 10 (Oct. 2026), 7930–7942. DOI:https://doi.org/10.55681/economina.v5i10.4592.